A bid of a C Highway Construction Budget and construction design Abstract :the item as 312 National Road Huning of the expansion project in Changzhou tenders part Magazine mileage :(K145 - K150 +880 +950),the total length of 4.93 km.The construction plan budget statement on the construction of the first budget plan and the role of the basis,and a brief overview of the project.Highway engineering calculation of this project including the subgrade for the calculation (cross-sectional area of roadbed and subgrade earth side); Pavement Engineering Calculation; protection works and drainage works in engineering calculations.And a detailed list of construction; Toone use the software to calculate the construction budget plan.In addition,the highway construction cost estimate for the constitution,the relevant rules and measurement software with the hope that the use of description and.The construction design of the main contents are :expounded on the basis,scope,principles and engineering overview; Construction to determine the overall objective analysis of the general layout of the construction; elaborate preparations for the construction of the main elements; specify a special roadbed,the roadbed construction,road construction program structure; and a related project program.In addition,details of the project quality,time,the assurance of safety measures; Civilization Construction and environmental protection measures; Also on the hot,rainy,winter night,and other special construction techniques and measures introduced.
英语翻译某一级公路C标段施工图预算及施工组织设计摘要:本项目作为312国道沪宁段扩建工程常州标段的一部分,起讫里程为:(
4个回答
相关问题
-
英语翻译[摘要]笔者认为作为大明商业步行街工程项目总监理工程师,对该项目施工组织设计、施工方案的严格审核,并对该工程实施
-
英语翻译摘 要本设计的题目是207国道张家口阳原段的设计,该公路为分向、分车道按需要控制出入的汽车专用公路.按一级公路标
-
道路工程中标段为K27+345是什么意思
-
翻译 安防工程的设计及施工
-
公路施工组织设计一般步骤
-
建筑工程施工组织设计课程设计任务书
-
英语翻译港口道路与312国道、沪宁高速公路、句蜀公路贯通,并与沪宁铁路和宁镇公路衔接,从港口中转的贸物经长江可直达全国各
-
论文开题报告 项目施工组织设计选题在工程中的目的和意义怎么写?
-
在建设工程上,项目实施计划书与施工组织设计与项目计划岗要本质上有什么区别啊?
-
英语翻译马钢(合肥)项目酸再生建安项目施工组织与实施