英语翻译大跨径桥梁施工难点之一是基础工程.马汊河大桥下部结构施工中的重点问题包括:水上钻机平台的设计,钢板桩围堰的设计和

1个回答

  • One of the difficulties in constructing large span bridges is foundation engineering. In the construction of the lower structures of Ma Cha He bridge, the major challenges are: the design of floating drilling deck, the design and construction of cofferdams surrounding the steel sheet piles, quality control during the construction of bored piles, temperature control during large volume concrete pours and the maintenance thereafter, design calculation for the temporal scaffolding in the cast-in-situ of starting segment. This paper describes the solutions and implementation guidelines for these challenges, and provides some theoretical calculation to prove the soundness of this project.