The complete equipment of large or oversize project cost ratio is higher, the urgent need to purchase a project, once payment is very difficult? Through financial institutions may, by using engineering cost, lease financing form, Directly from the manufacturer or rent, used to rent the consignee, the installment, still can form recycling old equipment, equipment configuration problems. Through the Internet published materials requirements and idle equipment information, By sharing machinery and equipment, process, to improve equipment utilization, reduce cost and freight lease, Strengthen and improve equipment maintenance and maintenance of equipment, can reduce the cost for the project pipe.
英语翻译成套的大型或特大型设备占工程造价比例较高,工程一上场急需购置,一次付款难度很大,怎么办?可以通过金融机构,用工程
1个回答
相关问题
-
急需工程造价暑假实习报告
-
英语翻译[摘要]:建筑工程施工管理是所有施工企业中必不可少的核心内容,是建筑工程技术、工程造价、建筑装饰、道理与桥梁工程
-
英语翻译摘要:工程造价的预结算审核是合理确定工程造价的必要程序及重要手段.通过对预、结算进行全面、系统的检查和复核,及时
-
(工程项目施工中的造价控制)翻译成英文是什么
-
南水北调东、西两线中工程难度较大的是哪线?
-
个人通过教育机构向希望小学或通过希望工程向小学捐赠可以全额在税前扣除吗?
-
公路、铁路工程造价中,
-
一项工程,实际造价比计划节约20%,实际造价是计划的?
-
请教一道建筑造价的题某工程主要购置M、N两类设备,M类设备基期欲购5台,单价是28万元,报告期实际购置6台,单价是35万
-
下列工程预算属于建筑工程造价的内容吗?请附说明,